Innovation-Verse logoINNOVATION-VERSE
IndustryManufacturing
Operating ModelCentralized GBS
GeographyGlobal
GBS FunctionFinance
ScenarioBase
Change context
GCC Intelligence

GCC Value & Economics Engine

A first-class engine that runs alongside the diagnostic and feeds Shape My GCC and Transform My GCC. Ten economic layers, a value bridge from investment to enterprise value, and an explicit basis on every number.

No figure here is a benchmark. Cost inputs are yours; ratios are Innovation-Verse modelling assumptions; nothing is attributed to Zinnov, nasscom, Gartner or EY. Cost advantage is never collapsed together with capability, innovation, revenue or resilience value into one ROI number.

Economic inputs

Everything you enter is tagged USER INPUT wherever it appears downstream.

Decision rights in the centre
AI ambition
Data foundations
Strategic objectives — these decide which economics matter
Capabilities in scope
Initial investment
$13.4M
Annual operating cost
$20.0M
Cost advantage
$28.0M
Total modelled value
$32.9M

Economic mandate

The economically optimal centre depends on the mandate. Lowest cost is not assumed to be best.

Economic mandate: CostTalent 50%

The stated objectives are cost-weighted, so cost economics legitimately dominate the design. Say so openly rather than dressing a delivery case as a capability case.

This profile biases the archetype ranking in Shape My GCC and Transform My GCC, so the recommended design follows the value the enterprise is actually trying to create. Current shaped archetype: Capability Center.

GCC Value Bridge

Investment → operating cost → productivity → capability → innovation / IP → revenue → enterprise value.

  1. Investment$13.4M
    CALCULATED OUTPUTOne-off setup, transition and ramp investment.
  2. Operating cost$20.0M
    CALCULATED OUTPUTAnnual run cost; $28.0M advantage against the retained-geography equivalent.
  3. Productivity$2.9M
    AI ESTIMATE57 FTE-equivalent of capacity created.
  4. Capability creation$1.3M
    AI ESTIMATECapability and talent value against the alternative sourcing route.
  5. Innovation / IP$0k
    AI ESTIMATENot claimed at this mandate.
  6. Revenue / business impact$400k
    AI ESTIMATERevenue enablement and speed effects.
  7. Enterprise value$32.9M
    CALCULATED OUTPUTTotal modelled value across all layers, cost advantage included.
Risk / resilience value$300k
AI ESTIMATEHeld separately so it is never absorbed into cost savings.
AI / automation value$2.3M
AI ESTIMATEAlready inside productivity; shown separately for visibility, not added twice.

Risk / resilience value and AI / automation value are shown separately so they are never absorbed into a cost-saving headline.

Ten economic layers (A–J)

Cost, productivity, capability, talent, innovation, revenue, speed, resilience, AI and enterprise value.

A

Cost economics

$20.0M annual run cost; $28.0M cost advantage against the retained-geography equivalent.

Workforce & compensation$15.2M
USER INPUT

400 people at $38k fully loaded.

Technology$1.4M
INNOVATION VERSE ASSUMPTION

Modelled at 9% of workforce cost; replace with the enterprise's own ratio.

Facilities$1.3M
INNOVATION VERSE ASSUMPTION

Modelled per seat; highly location-specific.

Management overhead$1.2M
INNOVATION VERSE ASSUMPTION

Service-stage supervision ratio.

Vendors & partners$912k
INNOVATION VERSE ASSUMPTION

Build support during entry.

Setup$3.2M
INNOVATION VERSE ASSUMPTION

Entity, site entry, infrastructure — one-off.

Transition$7.2M
INNOVATION VERSE ASSUMPTION

Recruitment, knowledge transfer and dual-running — one-off.

Location cost position68% below home
CALCULATED OUTPUT

Derived from the two cost-per-person figures you entered.

B

Productivity economics

14% modelled productivity effect — about 57 FTE-equivalent of capacity created.

Automation productivity10%
AI ESTIMATE

Derived from the automatability profile of the capabilities in scope.

AI productivity1%
AI ESTIMATE

Discounted heavily: weak data foundations cap realisable AI benefit.

Utilisation & cycle time3%
INNOVATION VERSE ASSUMPTION

Persistent teams reduce hand-back and re-planning loss.

Output per FTE effect14%
CALCULATED OUTPUT

Sum of the three effects above.

Capacity created57 FTE-equiv.
CALCULATED OUTPUT

Capacity released, not headcount removed — keep the two distinct.

C

Capability economics

$849k modelled capability value — the question is build vs buy, not cheap vs expensive.

Build (GCC) annual cost$20.0M
CALCULATED OUTPUT

Owned capability, retained knowledge, slower to stand up.

Buy (outsourcing) equivalent$20.5M
INNOVATION VERSE ASSUMPTION

Modelled at a 35% premium over owned run cost; replace with your actual vendor rates.

HQ retention equivalent$48.0M
USER INPUT

Cost of holding the same scope in the retained geography.

Capability scarcity index50%
CALCULATED OUTPUT

Derived from the capability mix in scope. Scarce capability rarely survives a vendor contract.

Capability value$849k
AI ESTIMATE

Indicative; validate against the cost of the alternative sourcing route, including acquisition.

D

Talent economics

$482k modelled talent value; attrition alone carries $1.2M of annual replacement cost.

Skill availabilityAvailable
USER INPUT

Scarcity determines hiring velocity and premium, not just salary.

Attrition & replacement cost$1.2M
INNOVATION VERSE ASSUMPTION

Modelled at 20% attrition and 40% of annual cost to replace.

Retention upside$182k
AI ESTIMATE

Limited at delivery stage — career depth is the lever.

Leadership leverageSite-level
USER INPUT

Autonomy determines whether leadership is an overhead or a lever.

Reskilling requirementHigh
AI ESTIMATE

Automatable scope must be met with a funded reskilling path, or productivity value converts into attrition.

E

Innovation economics

Innovation is not a stated objective — no innovation value is claimed.

Innovation value$0
USER INPUT

Do not model value the mandate does not ask for.

F

Revenue economics

No revenue objective is stated — no revenue contribution is claimed.

Revenue enablement$0k
AI ESTIMATE

Not claimed.

Product contributionIndirect
CALCULATED OUTPUT

Direct only where the centre owns a revenue-bearing product.

Customer impactNot in scope
USER INPUT

Customer-facing scope creates measurable revenue exposure, in both directions.

Market accelerationNot claimed
AI ESTIMATE

Only credible where the centre holds decision rights over release.

G

Speed economics

$400k modelled value from cycle-time, development, transformation and decision velocity.

Time-to-marketSecondary
USER INPUT

Follow-the-sun coverage only helps where hand-offs are designed out.

Decision velocityEscalated to HQ
USER INPUT

Every escalated decision class is a cycle-time cost.

Transformation velocityNot funded
USER INPUT

Change capacity is capacity, and must be resourced as such.

Speed value$400k
AI ESTIMATE

Indicative; validate against actual lead-time measures.

H

Resilience economics

$300k modelled resilience value from diversification and continuity.

Geographic diversificationIncidental
USER INPUT

Diversification only counts where scope is genuinely dual-run.

Continuity coverTransferable scope
AI ESTIMATE

The more the centre owns, the higher the continuity exposure.

Concentration riskContained
CALCULATED OUTPUT

Concentration grows with capability held, not only headcount.

Resilience value$300k
AI ESTIMATE

Reported separately so it is never buried inside cost savings.

I

AI economics

$2.3M modelled AI and automation value; realisation is bounded by data foundations rated 1/3.

AI productivity value$266k
AI ESTIMATE

Discounted to 40% — the data does not yet support the ambition.

Automation value$2.0M
AI ESTIMATE

Rule-based and workflow automation, ahead of any AI claim.

Agentic capacityPremature
CALCULATED OUTPUT

Agentic autonomy requires governed data and named human accountability.

AI investment required$479k
INNOVATION VERSE ASSUMPTION

Modelled as a share of technology spend; excludes remediation of data foundations.

Capacity released57 FTE-equiv.
CALCULATED OUTPUT

Released capacity is not a headcount reduction unless the enterprise decides to take it as one.

J

Enterprise value

$32.9M total modelled value, of which 15% is not labour cost difference.

Business outcomes$400k
CALCULATED OUTPUT

Revenue and speed effects the business can recognise.

Strategic capacity$1.3M
CALCULATED OUTPUT

Capability and talent value the enterprise would otherwise buy.

Transformation capacity$0k
AI ESTIMATE

Not claimed at this mandate.

Value beyond arbitrage15%
CALCULATED OUTPUT

Share of modelled value that is not labour cost difference.

Total modelled value$32.9M
CALCULATED OUTPUT

A sum of separately modelled layers. It is not an ROI and should never be quoted as one.

  • Every figure is indicative decision support, not a benchmark and not a forecast.
  • Cost inputs are user-supplied; ratios are Innovation-Verse modelling assumptions and should be replaced with enterprise actuals or a licensed benchmark.
  • No figure here is attributable to Zinnov, nasscom, Gartner or EY. Those sources inform which value dimensions are modelled, not the numbers.
  • AI productivity is heavily discounted because data foundations are rated weak.
  • Most modelled value is still labour arbitrage. That is a delivery economics profile, not a capability economics profile.
  • The stated objectives are cost-weighted, so cost economics legitimately dominate the design. Say so openly rather than dressing a delivery case as a capability case.

Business case

Each value type reported separately. There is deliberately no single ROI figure.

Initial investment$13.4M
CALCULATED OUTPUT

Setup, transition and ramp.

Annual operating cost$20.0M
CALCULATED OUTPUT

Run cost at the modelled headcount.

Cost advantage$28.0M
CALCULATED OUTPUT

Against the retained-geography equivalent — not a saving until the enterprise takes it.

Productivity value$2.9M
AI ESTIMATE

Capacity created, not headcount removed.

Capability value$849k
AI ESTIMATE

Against the alternative sourcing route.

Talent value$482k
AI ESTIMATE

Retention, scarce-skill access and leadership leverage.

Innovation value$0k
AI ESTIMATE

Only claimed where innovation is a stated objective.

Revenue enablement$0k
AI ESTIMATE

Only claimed where revenue is a stated objective.

Speed value$400k
AI ESTIMATE

Cycle-time, decision and transformation velocity.

Resilience value$300k
AI ESTIMATE

Diversification and continuity.

AI / automation value$2.3M
AI ESTIMATE

Included in productivity; shown separately, not counted twice.

Total modelled value$32.9M
CALCULATED OUTPUT

A sum of separately modelled layers. Not an ROI.

Year 1$1.4M

Build and stabilise — value realisation is partial by design.

Year 2$27.8M

Capability effects begin to exceed arbitrage.

Year 3$60.7M

Steady-state value at the stated mandate.

Indicative payback on cash-realisable value: 12 months. Share of modelled value that is labour arbitrage: 85%.

Sensitivity & uncertainty

What would have to be true for the case to change.

DriverSwing testedEffectBasis
Centre cost per person±15%Cost advantage moves by about $2.3M a year.USER INPUT
Data foundations1/3 → 3/3AI value could rise from $266k toward $2.0M.INNOVATION VERSE ASSUMPTION
Attrition20% ±5ppReplacement cost moves by about $304k a year.INNOVATION VERSE ASSUMPTION
Ramp speed45% → 65% year-one realisationPayback shortens from about 12 months to about 8 months.INNOVATION VERSE ASSUMPTION
Decision-rights transferAutonomy 1/3 → 3/3Capability, speed and innovation layers all lift; none of them are realisable while decisions escalate.AI ESTIMATE
USER INPUTEXTERNAL BENCHMARKINNOVATION VERSE ASSUMPTIONAI ESTIMATECALCULATED OUTPUT